bike path between the Dr. Herterich Avenue or the Haydn Road or the Rennweg along the railway line 
   request  
 
 The administration is responsible for enforcing the proposed control systems for decades, foot and cycle path between Dr. Herterich Avenue or Haydn or the Rennweg street along the railway line. 
 
 is currently a building in the proposed north-south route built. 
 The route of the pedestrian and bicycle path is secured by planning law. 
 Contrary to the building permit issued in the fixed distance of 3.00 m was only created a gap of 1.8 m (Bausenat of 22/09/2009. 
 
 spans Since 1989, a previously-used Overpass the west-east trending walking and Radweq (connection between Haydn and Einseiestraße road) which passes under the railway line 
. 
 
 Dr. Anna Maria Moratscheck 
 Prof. Dr. Gabriele Goderbauer-Marchner 
 Signed Rudolf cord 
 Signed Jacob Entholzner 
 signed signed Dr. Manfred Hölzlein 
 Dagmar Kaindl 
 signed Prof. Dr. Helmut Thomas Küffner 
 Signed Radlmeier 
 Signed: Dr. Stefan Schnurer 
 Signed Hans-Peter Summer 
 signed Gaby Sultanov 
 gez.lngeborg Pongratz 
 Signed Ludwig Zellner 
 Signed Sigrid Hagl 
 threaded 
 Signed Signed Robert Erwin signed Prof. Dr. Schneck 
 contact Christoph Zeitler 
 signed Bernd Friedrich 
 Signed: Christine Ackermann 
 Please   
 