Wednesday, October 7, 2009

Build Omega Sm300 From Parts

bike path between the Dr. Herterich Avenue or the Haydn Road or the Rennweg along the railway line

request

The administration is responsible for enforcing the proposed control systems for decades, foot and cycle path between Dr. Herterich Avenue or Haydn or the Rennweg street along the railway line.

is currently a building in the proposed north-south route built.
The route of the pedestrian and bicycle path is secured by planning law.
Contrary to the building permit issued in the fixed distance of 3.00 m was only created a gap of 1.8 m (Bausenat of 22/09/2009.

spans Since 1989, a previously-used Overpass the west-east trending walking and Radweq (connection between Haydn and Einseiestraße road) which passes under the railway line
.

Dr. Anna Maria Moratscheck
Prof. Dr. Gabriele Goderbauer-Marchner
Signed Rudolf cord
Signed Jacob Entholzner
signed signed Dr. Manfred Hölzlein
Dagmar Kaindl
signed Prof. Dr. Helmut Thomas Küffner
Signed Radlmeier
Signed: Dr. Stefan Schnurer
Signed Hans-Peter Summer
signed Gaby Sultanov
gez.lngeborg Pongratz
Signed Ludwig Zellner
Signed Sigrid Hagl
threaded
Signed Signed Robert Erwin signed Prof. Dr. Schneck
contact Christoph Zeitler
signed Bernd Friedrich
Signed: Christine Ackermann
Please

0 comments:

Post a Comment